Site visit, Reflectors on Bridge

Image
Drew has installed the reflectors on the bridge.

Site Visit Guardrail installation

Image
7:24am- Installing guardrail posts at the Southeast approach 8:59am- Continue guardrail post installation on the Southwest approach.

Site visit, Asphalt Roadway

Image
 Huff Asphalt was onsite to put down 2" asphalt.  Finished north side, moving equipment to south side.  Started south side  Finished south side, all left to do is roll south end  County and Contractor met landowner about leftover fill. County wants contractor to put it in this area to fill in low area.

Site Visit Asphalt application

Image
9:15am- Placing black base at South approach 10:01am- Driving posts for new fence. 10:54am- South approach completed. 11:37am- Place black base at North approach. 1:21pm- North approach completed.