Posts

Showing posts with the label 9-18-2017

Site visit, Poured Bent 2 Cap

Image
 Contractor was ready to Pour Bent 2 cap when I arrived, Concrete to arrive at 10. First truck arrived at 10:36, I tested concrete: Slump 4", Air 5.5%, Temp 68°. Made three cylinders, pour went good. Finished pour at 12:30.