Site visit, Started Dirt Compaction

 Contractor was removing the form work under the bridge.
 Worked on grouting holes and honeycomb areas.

 Installed the Geotextile Fabric and drain pipe


 Started Compaction on the south bent

 Backhoe broke a hose to power steering, will be down the rest of the day.