Site visit, Started Dirt Compaction
Contractor was removing the form work under the bridge.
Worked on grouting holes and honeycomb areas.
Installed the Geotextile Fabric and drain pipe
Started Compaction on the south bent
Backhoe broke a hose to power steering, will be down the rest of the day.
Worked on grouting holes and honeycomb areas.
Installed the Geotextile Fabric and drain pipe
Started Compaction on the south bent
Backhoe broke a hose to power steering, will be down the rest of the day.